Steel Mezzanine & Modular Office Build-Out at Building 238
Department of Defense
Solicitation FA8227-26-A-1002
Scope of work
Design and construct a new 1,200 SF (30' x 40') enclosed steel mezzanine with stairs in the South Center of Building 238. The upper level is framed and finished with modular walls to create an office, break room, and a multi-purpose computer lab/meeting space, including CAT6 data runs, LED lighting, and fire alarm and suppression rough-in. The steel structure bolts to the existing concrete slab on a maximum of nine columns with a minimum 11'-0" clear height below, and includes dedicated break-room circuits and plumbing stub-outs.
- Design-build delivery (design and construct)
- Performance & payment (P&P) bond required
- 120-day period of performance (per solicitation)
- Site visit held at Building 238, Hill AFB
Bidding this one? We can help.
bldbetter delivers fast, independent estimates so you bid with confidence.
Prime Contractor
Get an independent ROM estimate to cross-reference while you field bids.
Trade scope
Get a takeoff and estimate to buy back time and bid with confidence.