Hand-deconstruct and reconstruct approximately 90 LF of a historic 1803 mortared limestone retaining wall (roughly 4 ft tall, 1.5 ft thick) using NHL 3.5 lime mortar, numbering and salvaging each stone for reset in its original location. Hand-excavate and shore/crib the adjacent historic Green Tree Tavern porch, then install a fabric-wrapped washed-aggregate drainage layer with 4-inch perforated HDPE draintile daylighting through the wall via 2-inch PVC. Restore the lawn with 6 inches of topsoil and new turfgrass sod. Provide MUTCD traffic control along St. Marys Road with no drive-lane closures.
- Bid guarantee plus performance & payment (P&P) bond required
- 180-day performance period after NTP (Aug 15, 2026 – Feb 11, 2027)
- Site visit June 29, 2026; questions due on/about July 7, 2026
- Historic preservation work – salvage and reset original 1803 limestone with NHL 3.5 lime mortar
- MUTCD traffic control on St. Marys Road with no drive-lane closures
Bidding this one? We can help.
bldbetter delivers fast, independent estimates so you bid with confidence.
Prime Contractor
Get an independent ROM estimate to cross-reference while you field bids.
Trade scope
Get a takeoff and estimate to buy back time and bid with confidence.